ID 819221UPublicAt gradeEastern Idaho Railroad, LLC
This crossing has signs only, with no gates or lights. About 9 trains pass each day. About 3,900 vehicles cross each day. Counted in 2023. That count is 3 years old.
Reported movements, not a timetable.Quiet zone status: No quiet zone.Source: FRA inventory of 4 October 2026.
Most reported trains pass by day: 2 of 2.
Trains a day
Reported
By day, 6 AM to 6 PM
2
At night, 6 PM to 6 AM
0
Total
2
Plus 7 switching moves a day, not shown in the ring.
About 9 trains and 3,900 vehicles cross here each day.
Road traffic
3,900 vehicles a day
Road count year
2023
counted 2023, 3 years old
Reported train total
9 trains a day
Daytime trains
2 trains a day
Nighttime trains
0 trains a day
Switching trains
7 trains a day
Passenger trains
0 trains a day
School bus route
No
School-bus passes
Not reported
Maximum rail speed
10 mph
Road speed limit
25 mph
The daily train total combines reported daytime, nighttime and switching movements. These reported movements are not arrival times. How reported train totals work. A school bus that crosses and returns counts as two passes on a normal school day.
Most reported trains pass during the day.
From the FRA inventory of 4 October 2026. Values are reported trains a day.
Most reported trains pass during the day.
Kind of train
Trains a day
Daytime
2
Nighttime
0
Switching
7
Passenger
0
This crossing has signs only, with no gates or lights.
GXAPS does not rank crossings in terms of most to least dangerous. The output information is not the end or final product, and the GXAPS data should not be used for non-intended purposes.
Reports of blocked crossings
Reports of blocked crossings are loading.
FRA does not confirm the accuracy of the blocked crossing reports submitted to this portal. This collection is not designed to provide a representative sample or create generalizable statistics. The data gathered from this collection is not suitable for use in budgetary requests, nor regulatory proposals.
The incident count is not reported.
Earlier or unreported incidents may not be included.
Historical dates come from FRA reports. Recent dates show when Atlas observed a change. Neither confirms when work took place.
Loading record history…
1 project document names this crossing.
Project documents
The reviewed documents contain 1 reference to this crossing. A reference does not confirm that construction was completed. Check the project stage and funding status in each source. See three examples of reading project documents.
A024(781) SH46, EIRR RRX
obligated
Program
Idaho Railway-Highway Crossing Program (Section 130)
Year as reported
FY2025
Amount, USD
$320,000
What the amount covers
Section 130 funds obligated Oct 1, 2024–Sep 30, 2025; table first dollar column
Regional sample 3.3 mi from the reported crossing location. Climate averages cover 1979–2020.
What these figures describe
Population in the map area comes from a 2025 WorldPop model, summed over the map area that contains the reported crossing location. It is not a count of people who use the crossing. Unavailable estimates remain unknown.
Regional values use the nearest sample at roughly 3.1 mi scale. Elevation dates from 2011–2015. They do not describe exact conditions at the crossing.