The daily train total combines reported daytime, nighttime and switching movements. These reported movements are not arrival times. How reported train totals work. A school bus that crosses and returns counts as two passes on a normal school day.
No incident report was matched to this crossing in the available records from 2016 through July 2026. Earlier or unreported incidents may not be included.
The reviewed documents contain 1 reference to this crossing. A reference does not confirm that construction was completed. Check the project stage and funding status in each source. See three examples of reading project documents.
Clay County Crossing #385705E Elimination
selected for final design and construction
Program
FRA Railroad Crossing Elimination (RCE)
Year as reported
FY2023-2024
Amount, USD
$3,280,000
What the amount covers
up to; selected amount, not expenditure
Iowa – Clay County Crossing #385705E Elimination (Up to $3,280,000). The proposed project was selected for Final Design and Construction and includes activities to remove a Canadian Pacific Kansas City at-grade crossing and construct a high-level grade separation in Clay County, Iowa.
Regional sample 5.1 km from the reported crossing location. Climate averages cover 1979–2020.
What these figures describe
Population in the map cell comes from a 2025 WorldPop model, grouped into a hexagon containing the reported crossing coordinate. It is not a count of people who use the crossing. Unavailable estimates remain unknown.
Regional values use the nearest sample at roughly 5 km scale. Elevation dates from 2011–2015 and population density from 2020. They do not describe exact conditions at the crossing.