Which crossings are on Progressive Rail, Inc.'s Brooklyn Subdivision?

The FRA inventory of lists 8 public crossings on the Brooklyn Subdivision, from milepost 758.1 to 759.6.

Public crossings
8
Mileposts
758.1 to 759.6
Division
Portland
Most trains at one crossing
21 a day
Public crossings reported with gates
75%

Make a grant table of this line

Where along the line are the crossings?

  • Gates
  • Flashing lights
  • Signs
  • Other or not reported

Each bar is about 0.2 miles of the line. A taller bar means more public crossings there.

Where are these crossings on the map?

Browse the list
Crossings on page 1 of the Brooklyn Subdivision
Loading the map.

The map shows the crossings listed on this page.

Crossings in milepost order

Public crossings from the lowest milepost to the highest. Crossings without a milepost come last.

Page 1 of 1
  1. Southeast Carpenter DriveClackamasID 753597BGates0 trains a day
    MP 758.1Milepost
  2. Southeast Carpenter DriveClackamasID 753600GSigns only0 trains a day
    MP 758.2Milepost
  3. Southeast Carpenter DriveClackamasID 759767NGates0 trains a day
    MP 758.2Milepost
  4. Southeast Jennifer StreetClackamasID 759981TGates4 trains a day
    MP 758.3Milepost
  5. Southeast 106th AvenueClackamasID 759776MGates17 trains a day
    MP 759.1Milepost
  6. Southeast Safeway StreetClackamasID 974078JSigns only0 trains a day
    MP 759.2Milepost
  7. Southeast Jennifer StreetClackamasID 753595MGates4 trains a day
    MP 759.6Milepost
  8. Southeast Evelyn StreetClackamasID 759982AGates21 trains a day
    MP 759.6Milepost

Source: Federal Railroad Administration crossing inventory, with mileposts as each railroad reports them. Sources and dates