Which crossings are on Eastern Idaho Railroad, LLC's St Anthony Subdivision?

The FRA inventory of lists 4 public crossings on the St Anthony Subdivision, from milepost 34.6 to 37.4, in 2 towns.

Public crossings
4
Mileposts
34.6 to 37.4
Division
Northern
Route miles
0.1 miles
Public crossings per mile
65.6
Most trains at one crossing
2 a day
Public crossings reported with gates
0%

Make a grant table of this line

Where along the line are the crossings?

  • Gates
  • Flashing lights
  • Signs
  • Other or not reported

Each bar is about 0.7 miles of the line. A taller bar means more public crossings there.

Where are these crossings on the map?

Browse the list
Crossings on page 1 of the St Anthony Subdivision
Loading the map.

The map shows the crossings listed on this page.

Crossings in milepost order

Public crossings from the lowest milepost to the highest. Crossings without a milepost come last.

Page 1 of 1
  1. 2100 EastParkerID 812331FSigns only0 trains a day
    MP 34.6Milepost
  2. 500 NorthSt AnthonyID 812332MSigns only0 trains a day
    MP 35.7Milepost
  3. 2300 EastSt AnthonyID 812335HSigns only0 trains a day
    MP 37.3Milepost
  4. Yellowstone HighwaySt AnthonyID 812337WFlashing lights2 trains a day
    MP 37.4Milepost

Source: Federal Railroad Administration crossing inventory, with mileposts as each railroad reports them. Route miles: North American Rail Network Lines (US DOT, Bureau of Transportation Statistics). Sources and dates