RAILROAD over 21ST ST S

A railroad bridge over 21ST ST S in Moorhead, Minnesota.

What the bridge record says

  • Vertical clearance under the bridge: 18 ft 2 in (5.55 m), as recorded in the National Bridge Inventory, 2025.

    Built in 2022.

Clearance is the measured height recorded by the state in the National Bridge Inventory. The sign at the bridge can show a different figure.

Source: FHWA National Bridge Inventory, 2025.