UP RR(C&NW) over IL 25

A railroad bridge over IL 25 in South Elgin, Illinois.

What the bridge record says

  • Vertical clearance under the bridge: 16 ft 8 in (5.08 m), as recorded in the National Bridge Inventory, 2025.

    Built in 2015.

Clearance is the measured height recorded by the state in the National Bridge Inventory. The sign at the bridge can show a different figure.

Source: FHWA National Bridge Inventory, 2025.