IC&G RR over FAP 0038

A railroad bridge over FAP 0038 in Shipman, Illinois.

What the bridge record says

  • Vertical clearance under the bridge: 14 ft 0 in (4.27 m), as recorded in the National Bridge Inventory, 2025.

    Built in 1936.

Clearance is the measured height recorded by the state in the National Bridge Inventory. The sign at the bridge can show a different figure.

Source: FHWA National Bridge Inventory, 2025.