BNSF RR over FAU 6800 US 150/Main
A railroad bridge over FAU 6800 US 150/Main in Galesburg, Illinois.
What the bridge record says
Vertical clearance under the bridge: 16 ft 6 in (5.03 m), as recorded in the National Bridge Inventory, 2025.
Built in 2017.
Clearance is the measured height recorded by the state in the National Bridge Inventory. The sign at the bridge can show a different figure.
Source: FHWA National Bridge Inventory, 2025.