AMTRAK NE CORRIDOR over SSR 437
A railroad bridge over SSR 437 in New London, Connecticut.
What the bridge record says
Vertical clearance under the bridge: 14 ft 4 in (4.39 m), as recorded in the National Bridge Inventory, 2025.
Built in 1915.
Clearance is the measured height recorded by the state in the National Bridge Inventory. The sign at the bridge can show a different figure.
Source: FHWA National Bridge Inventory, 2025.