CALTRAIN UP AMTRAK over BIRD AVE

A railroad bridge over BIRD AVE in San Jose, California.

What the bridge record says

  • Vertical clearance under the bridge: 15 ft 1 in (4.62 m), as recorded in the National Bridge Inventory, 2025.

    Built in 1965.

Clearance is the measured height recorded by the state in the National Bridge Inventory. The sign at the bridge can show a different figure.

Source: FHWA National Bridge Inventory, 2025.