MTDB LRT & SDIV RR over E. BEYER BLVD

A railroad bridge over E. BEYER BLVD in San Diego, California.

What the bridge record says

  • Vertical clearance under the bridge: 14 ft 9 in (4.50 m), as recorded in the National Bridge Inventory, 2025.

    Built in 1928.

Clearance is the measured height recorded by the state in the National Bridge Inventory. The sign at the bridge can show a different figure.

Source: FHWA National Bridge Inventory, 2025.