CMSTPP RR over STH 20
A railroad bridge over STH 20 in Sturtevant, Wisconsin.
What the bridge record says
Vertical clearance under the bridge: 15 ft 5 in (4.72 m), as recorded in the National Bridge Inventory, 2025.
Built in 1977.
Clearance is the measured height recorded by the state in the National Bridge Inventory. The sign at the bridge can show a different figure.
Source: FHWA National Bridge Inventory, 2025.