CANADIAN NATIONAL over CTH VV (PIONEER RD)

A railroad bridge over CTH VV (PIONEER RD) in Fond Du Lac, Wisconsin.

What the bridge record says

  • Vertical clearance under the bridge: 15 ft 8 in (4.78 m), as recorded in the National Bridge Inventory, 2025.

    Built in 2013.

Clearance is the measured height recorded by the state in the National Bridge Inventory. The sign at the bridge can show a different figure.

Source: FHWA National Bridge Inventory, 2025.