SOUND TRANSIT RAIL over I-90 WB RAMPS STREET
A railroad bridge over I-90 WB RAMPS STREET in Bellevue, Washington.
What the bridge record says
Vertical clearance under the bridge: 25 ft 11 in (7.92 m), as recorded in the National Bridge Inventory, 2025.
Built in 2021.
Clearance is the measured height recorded by the state in the National Bridge Inventory. The sign at the bridge can show a different figure.
Source: FHWA National Bridge Inventory, 2025.