NORFOLK SOUTHERN over RTE 75
A railroad bridge over RTE 75 in Hamburg, New York.
What the bridge record says
Vertical clearance under the bridge: 14 ft 6 in (4.42 m), as recorded in the National Bridge Inventory, 2025.
Built in 1931.
Clearance is the measured height recorded by the state in the National Bridge Inventory. The sign at the bridge can show a different figure.
Source: FHWA National Bridge Inventory, 2025.