How many railroad crossings are in Glendale, New York?
The FRA inventory of lists 2 public railroad crossings in Glendale, New York.
- Public crossings
- 2
- Public crossings with identified warning devices
- 2
- Public crossings reported with gates
- 100%
- Most trains a day reported
- 8
- Reported incidents at public crossings since 2016
- 0
- Gate share compared with the state
- 32 percentage points higher
Where are these public crossings?
Browse the listThe map shows the available locations on this page. Area shading may include crossings outside this group.
Gates are reported at 100% of these crossings.
- Gates2100%
- Flashing lights without reported gates00%
- Signs without reported gates or lights00%
- Other or not reported00%
Each crossing appears once, grouped by its reported warning devices. Missing fields don't mean the warning devices are absent.
Which crossings in Glendale, New York have the most trains?
- The crossing on 73rd Street reports 8 trains a day.
- The crossing on 88th Street reports 6 trains a day.
They are on 73rd Street and 88th Street. None of the 2 public crossings in Glendale, New York has a quiet-zone designation.
Railroad bridges over roads in this city
- LIRR MAIN LINE over 57TH AVENUE
Vertical clearance under the bridge: 14 ft 0 in (4.29 m), as recorded in the National Bridge Inventory, 2025.
- LIRR MAIN LINE over 63RD DRIVE
Vertical clearance under the bridge: 14 ft 0 in (4.29 m), as recorded in the National Bridge Inventory, 2025.
- LIRR MAIN LINE over 71ST AVENUE
Vertical clearance under the bridge: 13 ft 11 in (4.26 m), as recorded in the National Bridge Inventory, 2025.
- LIRR MONTAUK BRANC over 908BX-Jackie Robinson Pk
Vertical clearance under the bridge: 12 ft 4 in (3.76 m), as recorded in the National Bridge Inventory, 2025.
- LIRR MONTAUK BRANC over 908BX-Jackie Robinson Pk
Vertical clearance under the bridge: 13 ft 10 in (4.24 m), as recorded in the National Bridge Inventory, 2025.
- LIRR MAIN LINE over ASCAN AVE
Vertical clearance under the bridge: 13 ft 4 in (4.08 m), as recorded in the National Bridge Inventory, 2025.
- LONG ISLAND RR over COOPER AVENUE
Vertical clearance under the bridge: 12 ft 7 in (3.86 m), as recorded in the National Bridge Inventory, 2025.
- EX-LONG ISLAND RR over FLEET STREET
Vertical clearance under the bridge: 15 ft 5 in (4.72 m), as recorded in the National Bridge Inventory, 2025.
- EX-LONG ISLAND RR over METROPOLITAN AVE
Vertical clearance under the bridge: 13 ft 11 in (4.26 m), as recorded in the National Bridge Inventory, 2025.
- EX-LONG ISLAND RR over PARK LANE SOUTH
Vertical clearance under the bridge: 14 ft 4 in (4.39 m), as recorded in the National Bridge Inventory, 2025.
- LIRR MAIN LINE over RTE I495
Vertical clearance under the bridge: 15 ft 5 in (4.72 m), as recorded in the National Bridge Inventory, 2025.
- LIRR MAIN LINE over RTE I495
Vertical clearance under the bridge: 14 ft 9 in (4.52 m), as recorded in the National Bridge Inventory, 2025.
- LIRR MAIN LINE over RTE I495
Vertical clearance under the bridge: 14 ft 9 in (4.52 m), as recorded in the National Bridge Inventory, 2025.
- LIRR MONTAUK BR over UNION TURNPIKE
Vertical clearance under the bridge: 13 ft 11 in (4.26 m), as recorded in the National Bridge Inventory, 2025.
- EX-LONG ISLAND RR over UNION TURNPIKE
Vertical clearance under the bridge: 14 ft 5 in (4.41 m), as recorded in the National Bridge Inventory, 2025.
- EX-LONG ISLAND RR over UNION TURNPIKE
Vertical clearance under the bridge: 14 ft 5 in (4.41 m), as recorded in the National Bridge Inventory, 2025.
- LIRR MAIN LINE over WOODHAVEN BLVD
Vertical clearance under the bridge: 14 ft 6 in (4.44 m), as recorded in the National Bridge Inventory, 2025.
- LIRR MAIN LINE over YELLOWSTONE BLVD
Vertical clearance under the bridge: 17 ft 5 in (5.33 m), as recorded in the National Bridge Inventory, 2025.
- EX-LONG ISLAND RR over YELLOWSTONE BLVD
Vertical clearance under the bridge: 14 ft 1 in (4.31 m), as recorded in the National Bridge Inventory, 2025.
Clearance is the measured height recorded by the state in the National Bridge Inventory. The sign at the bridge can show a different figure.
Source: FHWA National Bridge Inventory, 2025.
Incident counts cover January 2016 through 31 July 2026. They describe reported events, not a rating of crossings.
Traffic counts were collected at different times. Road count years appear with each record; train count years are not reported separately.
How many trains pass each crossing?
Public crossings are ordered by reported trains a day, from most to lowest.
Trains blocking a crossing in Glendale? How to report it.Blocked crossing rules in New York
Source: Federal Railroad Administration crossing inventory and reported highway-rail incidents. Sources and dates