CSX Railroad over 90IX RTE I90
A railroad bridge over 90IX RTE I90 in Batavia, New York.
What the bridge record says
Vertical clearance under the bridge: 14 ft 9 in (4.52 m), as recorded in the National Bridge Inventory, 2025.
Built in 1954.
Clearance is the measured height recorded by the state in the National Bridge Inventory. The sign at the bridge can show a different figure.
Source: FHWA National Bridge Inventory, 2025.