CN&W RR over Division St.
A railroad bridge over Division St. in Chicago, Illinois.
What the bridge record says
Vertical clearance under the bridge: 13 ft 10 in (4.22 m), as recorded in the National Bridge Inventory, 2025.
Clearance is the measured height recorded by the state in the National Bridge Inventory. The sign at the bridge can show a different figure.
Source: FHWA National Bridge Inventory, 2025.