IC RR over SPRINGFIELD(FAP 808)

A railroad bridge over SPRINGFIELD(FAP 808) in Champaign, Illinois.

What the bridge record says

  • Vertical clearance under the bridge: 12 ft 7 in (3.86 m), as recorded in the National Bridge Inventory, 2025.

    Built in 1926.

Clearance is the measured height recorded by the state in the National Bridge Inventory. The sign at the bridge can show a different figure.

Source: FHWA National Bridge Inventory, 2025.