ALASKA RAILROAD over INTL AIRPORT RD EB UP

A railroad bridge over INTL AIRPORT RD EB UP in Anchorage, Alaska.

What the bridge record says

  • Vertical clearance under the bridge: 17 ft 5 in (5.31 m), as recorded in the National Bridge Inventory, 2025.

    Built in 2002.

Clearance is the measured height recorded by the state in the National Bridge Inventory. The sign at the bridge can show a different figure.

Source: FHWA National Bridge Inventory, 2025.