LAMON RAILROAD over S RAILROAD AND CO ROAD

A railroad bridge over S RAILROAD AND CO ROAD in Brookside, Alabama.

What the bridge record says

  • Vertical clearance under the bridge: 22 ft 11 in (7.01 m), as recorded in the National Bridge Inventory, 2025.

    Built in 1910.

Clearance is the measured height recorded by the state in the National Bridge Inventory. The sign at the bridge can show a different figure.

Source: FHWA National Bridge Inventory, 2025.