Benjamin Ln railroad crossing in Boise, Idaho

ID 819604WPublicAt gradeBoise Valley Railroad, LLC

This crossing has signs only, with no gates or lights. About 2 trains pass each day. About 6,581 vehicles cross each day. Counted in 2016. That count is 10 years old.

Road traffic
6,581vehicles a day
Counted in 2016About traffic counts
Reported trains
2trains a day
These reported movements are not arrival times.
Warning devices
Signs only
See the warning device counts
Incidents since 2016
Not reported
Through July 2026. See the yearly reports
FRA inventory of Source detailsHow crossing IDs work

Location

Map of crossing ID 819604WLatitude 43.6060°, longitude -116.2882°.
Loading the map.
Directions
Share

Cite this page

The link keeps this version of the data.

Link to this version

https://railcrossingatlas.tansolutions.org/crossings/819604W?revision=fra-a3a8a15f1cac1393ba31c641

APA

Rail Crossing Atlas, Tan Solutions. (2026, October 4). Crossing 819604W (Published revision fra-a3a8a15f1cac1393ba31c641). https://railcrossingatlas.tansolutions.org/crossings/819604W?revision=fra-a3a8a15f1cac1393ba31c641

Chicago

Rail Crossing Atlas, Tan Solutions. “Crossing 819604W.” October 4, 2026. Published revision fra-a3a8a15f1cac1393ba31c641. https://railcrossingatlas.tansolutions.org/crossings/819604W?revision=fra-a3a8a15f1cac1393ba31c641.

BibTeX

@misc{railcrossingatlas-819604W-fra-a3a8a15f1cac1393ba31c641,
  author = {{Rail Crossing Atlas, Tan Solutions}},
  publisher = {Rail Crossing Atlas, Tan Solutions},
  title = {Crossing 819604W},
  year = {2026},
  date = {2026-10-04},
  version = {fra-a3a8a15f1cac1393ba31c641},
  url = {https://railcrossingatlas.tansolutions.org/crossings/819604W?revision=fra-a3a8a15f1cac1393ba31c641}
}
SaveSign in to save crossings.
Compare
43.60601, -116.28822 (FRA source coordinates)

Most reported trains pass by day: 2 of 2.

Reported movements, not a timetable.Quiet zone status: No quiet zone.Source: FRA inventory of 4 October 2026.

About 2 trains and 6,581 vehicles cross here each day.

Road traffic
6,581 vehicles a day
Road count year
2016
counted 2016, 10 years old
Reported train total
2 trains a day
Daytime trains
2 trains a day
Nighttime trains
0 trains a day
Switching trains
0 trains a day
Passenger trains
0 trains a day
School bus route
No
School-bus passes
Not reported
Maximum rail speed
25 mph
Road speed limit
25 mph

The daily train total combines reported daytime, nighttime and switching movements. These reported movements are not arrival times. How reported train totals work. A school bus that crosses and returns counts as two passes on a normal school day.

So few trains are reported here that the list above shows the whole mix.

This crossing has signs only, with no gates or lights.

0 gate arms and 0 flashing-light pairs. 2 crossbuck assemblies; 2 stop signs.
Gate arms: 0Flashing-light pairs: 0Crossbuck assemblies: 2Stop signs: 2
The symbols show reported counts, not device positions. 1 main track is reported.
Gate arms
0
Flashing-light pairs
0
Crossbuck assemblies
2
Stop signs
2
Main tracks
1
Quiet-zone source value
No

All warning device counts are reported. Zero is shown only when the source reports zero. How warning devices are recorded

Open the federal crossing record

How this crossing compares.

Traffic exposure

Loading

Percentile among crossings with reported countsNot available

The measure is being loaded.

How this is calculated

Record confidence

Loading

Not available

The measure is being loaded.

How this is calculated

FRA GXAPS prediction

The FRA prediction is loading.

FRA says GXAPS does not rank crossings from most to least likely to have an incident. The output information is not the end or final product, and the GXAPS data should not be used for non-intended purposes.

Reports of blocked crossings

Reports of blocked crossings are loading.

FRA does not confirm the accuracy of the blocked crossing reports submitted to this portal. This collection is not designed to provide a representative sample or create generalizable statistics. The data gathered from this collection is not suitable for use in budgetary requests, nor regulatory proposals.

The incident count is not reported.

Earlier or unreported incidents may not be included.

Open the federal incident reports

Record history.

Record history

Historical dates come from FRA reports. Recent dates show when Atlas observed a change. Neither confirms when work took place.

Loading record history…

2 project documents name this crossing.

Project documents

The reviewed documents contain 2 references to this crossing. A reference does not confirm that construction was completed. Check the project stage and funding status in each source. See three examples of reading project documents.

STC-3083, BENJAMIN LN, BVRR RRX 819604W, BOISE

programmed not obligated
Source document
Idaho approved transportation investment program, FY2027 through FY2033, dated September 26, 2026
Program
Idaho Transportation Investment Program, FY2027 through FY2033, Rail-Highway Crossing Program
Year as reported
2030
Amount, USD
$390,000
What the amount covers
Scheduled CN phase with match in year-of-expenditure dollars; table in $1,000 units; excludes separate PE and RW costs; not an award or obligated amount
FY 2027 - FY 2033 Approved ITIP Hwy Safety - Railroad Crossings Approved 9/17/26 Sponsor Program Fund Ph 2027 2028 2029 2030 2031 2032 2033 PREL Total Federal Match Notes STC-3083, BENJAMIN LN, BVRR RRX 819604W, BOISE 3 CN - - - 390 - - - - 390 390 - 1 20537 MP 0.080 - 0.080 SAFTY/TRAF OPER, Railroad Signals PE - 75 - - - - - - 95 93 2 ADA COUNTY HD RAIL (L) FED RRX RW - - - - - - - - - - - Install type 1 signal including constant warning detection, planking, and cabinet.

Source note: Project key 20537. The board approved the FY2027 through FY2033 plan on 17 September 2026. This table was generated on 26 September 2026. The amount covers the scheduled CN phase with match in year-of-expenditure dollars. It excludes separate preliminary engineering and right-of-way costs. Separate preliminary engineering is scheduled for FY2028 at $75,000. The plan is subject to revision. It does not establish an award, an obligation or completed construction. Earlier board-packet entries retain their original dates and amounts.

Idaho Transportation Improvement Program: Rail-Highway Crossing Program

programmed not obligated
Source document
Idaho Transportation Board packet, December 2025, dated December 3, 2025
Program
Idaho Transportation Improvement Program: Rail-Highway Crossing Program
Year as reported
2030
Amount, USD
$350,000
What the amount covers
ITIP budget, table in $1,000 units; not an obligated amount
20537 3 UPRR / BVRR Benjamin Lane, BVRR RRX 819604W, Boise, install signals, gates and upgrade planking 350 2030

What's around this crossing.

The surrounding landscape

See the surroundings Members

Nearby land cover

The 2025 estimates cover roughly 10 hectares around each crossing.

Population and climate nearby

Modeled population in this map area
917 (WorldPop 2025)
Regional surface elevation
2,640 ft
Average annual air temperature
52.2 °F
Average annual rain & snow
15.4 in/year
See population estimates over time Members

Regional sample 2.7 mi from the reported crossing location. Climate averages cover 1979–2020.

What these figures describe

Population in the map area comes from a 2025 WorldPop model, summed over the map area that contains the reported crossing location. It is not a count of people who use the crossing. Unavailable estimates remain unknown.

Regional values use the nearest sample at roughly 3.1 mi scale. Elevation dates from 2011–2015. They do not describe exact conditions at the crossing.

Surroundings sources