Park Street railroad crossing in Inkom, Idaho

ID 811315TPublicAt gradeUnion Pacific Railroad Company

This crossing has flashing lights but no gates. About 24 trains pass each day. About 1,100 vehicles cross each day. Counted in 2023. That count is 3 years old.

Road traffic
1,100vehicles a day
Counted in 2023About traffic counts
Reported trains
24trains a day
These reported movements are not arrival times.
Warning devices
Lights, no gates
See the warning device counts
Incidents since 2016
1
Through July 2026. See the yearly reports
FRA inventory of Source detailsHow crossing IDs work

Location

Map of crossing ID 811315TLatitude 42.7922°, longitude -112.2517°.
Loading the map.
Directions
Share

Cite this page

The link keeps this version of the data.

Link to this version

https://railcrossingatlas.tansolutions.org/crossings/811315T?revision=fra-a3a8a15f1cac1393ba31c641

APA

Rail Crossing Atlas, Tan Solutions. (2026, October 4). Crossing 811315T (Published revision fra-a3a8a15f1cac1393ba31c641). https://railcrossingatlas.tansolutions.org/crossings/811315T?revision=fra-a3a8a15f1cac1393ba31c641

Chicago

Rail Crossing Atlas, Tan Solutions. “Crossing 811315T.” October 4, 2026. Published revision fra-a3a8a15f1cac1393ba31c641. https://railcrossingatlas.tansolutions.org/crossings/811315T?revision=fra-a3a8a15f1cac1393ba31c641.

BibTeX

@misc{railcrossingatlas-811315T-fra-a3a8a15f1cac1393ba31c641,
  author = {{Rail Crossing Atlas, Tan Solutions}},
  publisher = {Rail Crossing Atlas, Tan Solutions},
  title = {Crossing 811315T},
  year = {2026},
  date = {2026-10-04},
  version = {fra-a3a8a15f1cac1393ba31c641},
  url = {https://railcrossingatlas.tansolutions.org/crossings/811315T?revision=fra-a3a8a15f1cac1393ba31c641}
}
SaveSign in to save crossings.
Compare
42.79216, -112.25174 (FRA source coordinates)

As many reported trains pass at night as by day (10 each).

Reported movements, not a timetable.Quiet zone status: No quiet zone.Source: FRA inventory of 4 October 2026.

Plus 4 switching moves a day, not shown in the ring.

About 24 trains and 1,100 vehicles cross here each day.

Road traffic
1,100 vehicles a day
Road count year
2023
counted 2023, 3 years old
Reported train total
24 trains a day
Daytime trains
10 trains a day
Nighttime trains
10 trains a day
Switching trains
4 trains a day
Passenger trains
0 trains a day
School bus route
No
School-bus passes
Not reported
Maximum rail speed
50 mph
Road speed limit
Not reported

The daily train total combines reported daytime, nighttime and switching movements. These reported movements are not arrival times. How reported train totals work. A school bus that crosses and returns counts as two passes on a normal school day.

Daytime and nighttime trains are reported in equal numbers.

From the FRA inventory of 4 October 2026. Values are reported trains a day.

This crossing has flashing lights but no gates.

0 gate arms and 5 flashing-light pairs. 0 crossbuck assemblies; 0 stop signs.
Gate arms: 0Flashing-light pairs: 5Crossbuck assemblies: 0Stop signs: 0
The symbols show reported counts, not device positions. 2 main tracks are reported.
Gate arms
0
Flashing-light pairs
5
Crossbuck assemblies
0
Stop signs
0
Main tracks
2
Quiet-zone source value
No

All warning device counts are reported. Zero is shown only when the source reports zero. How warning devices are recorded

Open the federal crossing record

How this crossing compares.

Traffic exposure

Loading

Percentile among crossings with reported countsNot available

The measure is being loaded.

How this is calculated

Record confidence

Loading

Not available

The measure is being loaded.

How this is calculated

FRA GXAPS prediction

The FRA prediction is loading.

FRA says GXAPS does not rank crossings from most to least likely to have an incident. The output information is not the end or final product, and the GXAPS data should not be used for non-intended purposes.

Reports of blocked crossings

Reports of blocked crossings are loading.

FRA does not confirm the accuracy of the blocked crossing reports submitted to this portal. This collection is not designed to provide a representative sample or create generalizable statistics. The data gathered from this collection is not suitable for use in budgetary requests, nor regulatory proposals.

1 incident was reported here since 2016.

Reports
1
People injured
0
People killed
0

The only matched report year is 2026.

Source: FRA incident reports matched to this crossing. Incident records cover 2016 through July 2026. 2026 is a partial year and cannot be compared directly with a full year.
Reports dated 2016 through July 2026. 2026 covers incidents through 31 July 2026, a partial year. Counts are past reports; they do not forecast what happens next.
YearReportsInjuredKilled
2026100
Open the federal incident reports

Record history.

Record history

Historical dates come from FRA reports. Recent dates show when Atlas observed a change. Neither confirms when work took place.

Loading record history…

2 project documents name this crossing.

Project documents

The reviewed documents contain 2 references to this crossing. A reference does not confirm that construction was completed. Check the project stage and funding status in each source. See three examples of reading project documents.

STC-1764, CEMENT PLANT RD, UPRR RRX 811315T, INKOM

programmed not obligated
Source document
Idaho approved transportation investment program, FY2027 through FY2033, dated September 26, 2026
Program
Idaho Transportation Investment Program, FY2027 through FY2033, Rail-Highway Crossing Program
Year as reported
2029
Amount, USD
$375,000
What the amount covers
Scheduled CN phase with match in year-of-expenditure dollars; table in $1,000 units; excludes separate PE and RW costs; not an award or obligated amount
FY 2027 - FY 2033 Approved ITIP Hwy Safety - Railroad Crossings Approved 9/17/26 Sponsor Program Fund Ph 2027 2028 2029 2030 2031 2032 2033 PREL Total Federal Match Notes STC-1764, CEMENT PLANT RD, UPRR RRX 811315T, INKOM 5 CN - - 375 - - - - - 375 375 - 19930 MP 0.160 - 0.160 SAFTY/TRAF OPER, Railroad Gates PE - 25 30 - - - - - 55 55 - INKOM RAIL (L) FED RRX RW - - - - - - - - - - - This project will add crossing gates at the rail crossing on Park Street.

Source note: Project key 19930. The board approved the FY2027 through FY2033 plan on 17 September 2026. This table was generated on 26 September 2026. The amount covers the scheduled CN phase with match in year-of-expenditure dollars. It excludes separate preliminary engineering and right-of-way costs. Separate preliminary engineering is scheduled for FY2028 at $25,000. Separate preliminary engineering is scheduled for FY2029 at $30,000. The plan is subject to revision. It does not establish an award, an obligation or completed construction. Earlier board-packet entries retain their original dates and amounts.

Idaho Transportation Improvement Program: Rail-Highway Crossing Program

programmed not obligated
Source document
Idaho Transportation Board packet, December 2025, dated December 3, 2025
Program
Idaho Transportation Improvement Program: Rail-Highway Crossing Program
Year as reported
2029
Amount, USD
$375,000
What the amount covers
ITIP budget, table in $1,000 units; not an obligated amount
19930 5 UPRR STC-1764, Park Street, UPRR RRX 811315T, Inkom, upgrade signals, add gates and upgrade planking 375 2029

What's around this crossing.

The surrounding landscape

See the surroundings Members

Nearby land cover

The 2025 estimates cover roughly 10 hectares around each crossing.

Population and climate nearby

Modeled population in this map area
11 , WorldPop 2025
Regional surface elevation
4,602 ft
Average annual air temperature
45.7 °F
Average annual rain & snow
21.6 in/year
See population estimates over time Members

Regional sample 1.1 mi from the reported crossing location. Climate averages cover 1979–2020.

What these figures describe

Population in the map area comes from a 2025 WorldPop model, summed over the map area that contains the reported crossing location. It is not a count of people who use the crossing. Unavailable estimates remain unknown.

Regional values use the nearest sample at roughly 3.1 mi scale. Elevation dates from 2011–2015. They do not describe exact conditions at the crossing.

Surroundings sources