Keys Rd railroad crossing in Pleasant Grove, California
DOT 834917YPublicAt gradeUnion Pacific Railroad Company
This crossing has signs only, with no gates or lights. About 10 trains pass each day. About 15 vehicles cross each day. Counted in 2023. That count is 3 years old.
About 10 trains and 15 vehicles cross here each day.
Road traffic
15 vehicles a day
Road count year
2023
counted 2023, 3 years old
Reported train total
10 trains a day
Daytime trains
5 trains a day
Nighttime trains
5 trains a day
Switching trains
0 trains a day
Passenger trains
0 trains a day
School bus route
No
School-bus passes
Not reported
Maximum rail speed
70 mph
Road speed limit
40 mph
The daily train total combines reported daytime, nighttime and switching movements. These reported movements are not arrival times. How reported train totals work. A school bus that crosses and returns counts as two passes on a normal school day.
Through trains per day
5 by day5 at night
Daytime and nighttime trains are reported in equal numbers.
From the FRA crossing inventory, week of 4 October 2026. Values are reported trains a day.
Daytime and nighttime trains are reported in equal numbers.
Kind of train
Trains per day
Daytime
5
Nighttime
5
Switching
0
Passenger
0
This crossing has signs only, with no gates or lights.
GXAPS does not rank crossings in terms of most to least dangerous. The output information is not the end or final product, and the GXAPS data should not be used for non-intended purposes.
Reports of blocked crossings
Reports of blocked crossings are loading.
FRA does not confirm the accuracy of the blocked crossing reports submitted to this portal. This collection is not designed to provide a representative sample or create generalizable statistics. The data gathered from this collection is not suitable for use in budgetary requests, nor regulatory proposals.
The incident count is not reported.
Earlier or unreported incidents may not be included.
Historical dates come from FRA reports. Recent dates show when Atlas observed a change. Neither confirms when work took place.
Loading record history…
1 project document names this crossing.
Project documents
The reviewed documents contain 1 reference to this crossing. A reference does not confirm that construction was completed. Check the project stage and funding status in each source. See three examples of reading project documents.
Keys Road
listed PE phase
Program
California Section 130 Railway-Highway Crossings Program
Year as reported
2019-2020
Amount, USD
Not listed
What the amount covers
not listed in source
7500279 Keys Road Local Agency 2019-2020 PE 5918 0320000201 50LP279 11/01/20 12/31/24 3 Sutter Unincorporated N/A 004-153.90 / SUT-1026 834917Y
Regional sample 4.6 km from the reported crossing location. Climate averages cover 1979–2020.
What these figures describe
Population in the map cell comes from a 2025 WorldPop model, grouped into a hexagon containing the reported crossing coordinate. It is not a count of people who use the crossing. Unavailable estimates remain unknown.
Regional values use the nearest sample at roughly 5 km scale. Elevation dates from 2011–2015. They do not describe exact conditions at the crossing.