400 West railroad crossing in Minidoka, Idaho

DOT 812803APublicAt gradeUnion Pacific Railroad Company

This crossing has signs only, with no gates or lights. About 17 trains pass each day. About 790 vehicles cross each day. Counted in 2023. That count is 3 years old.

Road traffic
790vehicles a day
Counted in 2023About traffic counts
Reported trains
17trains a day
These reported movements are not arrival times.
Warning devices
Signs only
See the equipment counts
Incidents since 2016
3
Through July 2026. See the yearly reports
Source retrieved Source detailsHow crossing IDs work

Location

Map of crossing 812803A and nearby crossingsLatitude 42.8119°, longitude -113.7441°.
Loading the map.
DirectionsSign in to save crossings.
Compare

Embed this crossing

Add a dated card to your article with a link to the source.

Theme
Size

The card fits its column. Choose a theme to match your article, or let the browser choose automatically.

Live preview

400 × 520 px

The preview is loading.

Open the preview in a new tab
42.81188, -113.74411 (FRA source coordinates)

About 17 trains and 790 vehicles cross here each day.

Road traffic
790 vehicles a day
Road count year
2023
counted 2023, 3 years old
Reported train total
17 trains a day
Daytime trains
9 trains a day
Nighttime trains
8 trains a day
Switching trains
0 trains a day
Passenger trains
0 trains a day
School bus route
No
School-bus passes
0 / school day
Maximum rail speed
70 mph
Road speed limit
35 mph

The daily train total combines reported daytime, nighttime and switching movements. These reported movements are not arrival times. How reported train totals work. A school bus that crosses and returns counts as two passes on a normal school day.

Most reported trains pass during the day.

From the FRA crossing inventory, week of 4 October 2026. Values are reported trains a day.

This crossing has signs only, with no gates or lights.

0 gate arms and 0 flashing-light pairs. 2 crossbuck assemblies; 0 stop signs.
Gate arms: 0Flashing-light pairs: 0Crossbuck assemblies: 2Stop signs: 0
The symbols show reported counts, not equipment positions. 1 main track is reported.
Gate arms
0
Flashing-light pairs
0
Crossbuck assemblies
2
Stop signs
0
Main tracks
1
Quiet-zone source value
No

All equipment counts are reported. Zero is shown only when the source reports zero. How warning equipment is recorded

Open the federal crossing record

How this crossing compares.

Traffic exposure

Loading

Percentile among crossings with reported countsNot available

The measure is being loaded.

How this is calculated

Record confidence

Loading

Not available

The measure is being loaded.

How this is calculated

FRA GXAPS prediction

The FRA prediction is loading.

GXAPS does not rank crossings in terms of most to least dangerous. The output information is not the end or final product, and the GXAPS data should not be used for non-intended purposes.

Reports of blocked crossings

Reports of blocked crossings are loading.

FRA does not confirm the accuracy of the blocked crossing reports submitted to this portal. This collection is not designed to provide a representative sample or create generalizable statistics. The data gathered from this collection is not suitable for use in budgetary requests, nor regulatory proposals.

3 incidents were reported here since 2016.

Reports
3
People injured
0
People killed
0

Reports were matched in 3 years. The latest is 2022.

Source: FRA incident reports matched to this crossing. Incident records cover 2016 through July 2026. 2026 is a partial year and cannot be compared directly with a full year.
Reports dated 2016 through July 2026. 2026 covers incidents through 31 July 2026, a partial year. Counts are historical, not risk predictions.
YearReportsInjuredKilled
2016100
2020100
2022100
Open the federal incident records

What has changed in this record.

Record history

Historical dates come from FRA reports. Recent dates show when Atlas observed a change. Neither confirms when work took place.

Loading record history…

2 project documents name this crossing.

Project documents

The reviewed documents contain 2 references to this crossing. A reference does not confirm that construction was completed. Check the project stage and funding status in each source. See three examples of reading project documents.

OFFSYS, N 400 W, UPRR RRX 812803A, MINIDOKA CO

programmed not obligated
Source document
Idaho approved transportation investment program, FY2027 through FY2033, dated September 26, 2026
Program
Idaho Transportation Investment Program, FY2027 through FY2033, Rail-Highway Crossing Program
Year as reported
2028
Amount, USD
$400,000
What the amount covers
Scheduled CN phase with match in year-of-expenditure dollars; table in $1,000 units; excludes separate PE and RW costs; not an award or obligated amount
FY 2027 - FY 2033 Approved ITIP Hwy Safety - Railroad Crossings Approved 9/17/26 Sponsor Program Fund Ph 2027 2028 2029 2030 2031 2032 2033 PREL Total Federal Match Notes OFFSYS, N 400 W, UPRR RRX 812803A, MINIDOKA CO 4 CN - 400 - - - - - - 400 400 - 23374 MP 14.268 - 14.268 SAFTY/TRAF OPER, Miscellaneous Impr PE - - - - - - - - - - - MINIDOKA COUNTY RAIL (L) FED RRX RW - - - - - - - - - - - This project will install railroad signals, gates, and improve the crossing surface on N 400 W Road.

Source note: Project key 23374. The board approved the FY2027 through FY2033 plan on 17 September 2026. This table was generated on 26 September 2026. The amount covers the scheduled CN phase with match in year-of-expenditure dollars. It excludes separate preliminary engineering and right-of-way costs. The plan is subject to revision. It does not establish an award, an obligation or completed construction. Earlier board-packet entries retain their original dates and amounts.

Idaho Transportation Improvement Program: Rail-Highway Crossing Program

programmed not obligated
Source document
Idaho Transportation Board packet, December 2025, dated December 3, 2025
Program
Idaho Transportation Improvement Program: Rail-Highway Crossing Program
Year as reported
2028
Amount, USD
$400,000
What the amount covers
ITIP budget, table in $1,000 units; not an obligated amount
23374 4 UPRR Offsys, N 400 W, UPRR RRX 812803A, Minidoka County, install signals, gates and upgrade planking 400 2028

What's around this crossing.

The surrounding landscape

Explore the atlas (sign in) ↗

Nearby land cover

The 2025 estimates cover roughly 10 hectares around each crossing.

Population and climate nearby

Modeled population in this map cell
7 , WorldPop 2025
Regional surface elevation
1,324 m
Average annual air temperature
9.9 °C
Average annual rain & snow
351 mm/year
See population estimates over time (sign in)

Regional sample 3.8 km from the reported crossing location. Climate averages cover 1979–2020.

What these figures describe

Population in the map cell comes from a 2025 WorldPop model, grouped into a hexagon containing the reported crossing coordinate. It is not a count of people who use the crossing. Unavailable estimates remain unknown.

Regional values use the nearest sample at roughly 5 km scale. Elevation dates from 2011–2015. They do not describe exact conditions at the crossing.

Sources and methods ↗

3 other crossings are within 5 km.

These records are within 3.1 miles of the reported location. Distances are straight-line estimates.