Rail Crossing AtlasUSA
Buy me a coffee
AppearanceSystem

Railroad crossing 812404N on 800 EAST in MINIDOKA, Idaho

The federal record lists a public crossing on 800 EAST in MINIDOKA, Idaho. The reported railroad is Union Pacific Railroad Company.

Overview

Crossing812404N
800 EAST
MINIDOKA, MINIDOKA County, Idaho
Union Pacific Railroad Company
How crossing IDs work
Source retrieved Source details
Road traffic
110 vehicles / day
The reported road count year is 2002. About traffic counts and years
Reported trains
17 / day
These reported movements are not arrival times.

Location

View the reported crossing location on the map.

Source latitude
42.760066
Source longitude
-113.511517

Traffic

Road traffic
110 vehicles / day
Road count year
2002
Reported train total
17 / day
Daytime trains
9 / day
Nighttime trains
8 / day
Switching trains
0 / day
Passenger trains
0 / day
School bus route
No
School-bus passes
Not reported / school day
Maximum rail speed
70 mph
Road speed limit
35 mph

The daily train total combines reported daytime, nighttime and switching movements. These reported movements are not arrival times. How reported train totals work. A school bus that crosses and returns counts as two passes on a normal school day.

Equipment

Gate arms
0
Flashing-light pairs
0
Crossbuck assemblies
2
Stop signs
1

How warning equipment is recorded

Main tracks
1
Quiet-zone source value
No

All equipment counts are reported. Zero is shown only when the source reports zero.

Open the federal crossing record

Incidents

Reports
2
People injured
0
People killed
2
Reports dated 2016 through July 2026; 2026 is a partial year. Counts are historical, not risk predictions.
YearReportsInjuredKilled
2017101
2018101
Open the federal incident records

Projects

Project documents

The reviewed documents contain 2 references to this crossing. A reference does not confirm that construction was completed. Check the project stage and funding status in each source. See three examples of reading project documents.

OFFSYS, N 800 E UPRR RRX 812404N, MINIDOKA HD

programmed not obligated
Source document
Idaho approved transportation investment program, FY2027 through FY2033, dated September 26, 2026
Program
Idaho Transportation Investment Program, FY2027 through FY2033, Rail-Highway Crossing Program
Year as reported
2030
Amount, USD
$590,000
What the amount covers
Scheduled CN phase with match in year-of-expenditure dollars; table in $1,000 units; excludes separate PE and RW costs; not an award or obligated amount
FY 2027 - FY 2033 Approved ITIP Hwy Safety - Railroad Crossings Approved 9/17/26 Sponsor Program Fund Ph 2027 2028 2029 2030 2031 2032 2033 PREL Total Federal Match Notes OFFSYS, N 800 E UPRR RRX 812404N, MINIDOKA HD 4 CN - - - 590 - - - - 590 590 - 23016 MP 100.750 - 100.750SAFTY/TRAF OPER, Railroad Gates PE - 40 - - - - - - 60 60 - MINIDOKA HD RAIL (L) FED RRX RW - - - - - - - - - - - This project will install railroad signals, gates, and improve the crossing surface on N 800 E.

Source note: Project key 23016. The board approved the FY2027 through FY2033 plan on 17 September 2026. This table was generated on 26 September 2026. The amount covers the scheduled CN phase with match in year-of-expenditure dollars. It excludes separate preliminary engineering and right-of-way costs. Separate preliminary engineering is scheduled for FY2028 at $40,000. The plan is subject to revision. It does not establish an award, an obligation or completed construction. Earlier board-packet entries retain their original dates and amounts.

Idaho Transportation Improvement Program: Rail-Highway Crossing Program

programmed not obligated
Source document
Idaho Transportation Board packet, December 2025, dated December 3, 2025
Program
Idaho Transportation Improvement Program: Rail-Highway Crossing Program
Year as reported
2030
Amount, USD
$590,000
What the amount covers
ITIP budget, table in $1,000 units; not an obligated amount
23016 4 UPRR Offsys, N 800 E UPRR RRX 812404N, Minidoka HD, install signals, gates and upgrade planking 590 2030

Surroundings

The surrounding landscape

Explore the atlas (sign in) ↗

Nearby land cover

The 2025 estimates cover roughly 10 hectares around each crossing.

Population and climate nearby

Modeled population in this map cell
10 · 2025
Regional population density
5 people/km² · 2020
Regional surface elevation
1,277 m
Average annual air temperature
10.2 °C
Average annual rain & snow
344 mm/year
See population estimates over time (sign in)

Regional sample 6.3 km from the reported crossing location. Climate averages cover 1979–2020.

What these figures describe

Population in the map cell comes from a 2025 WorldPop model, grouped into a hexagon containing the reported crossing coordinate. It is not a count of people who use the crossing. Unavailable estimates remain unknown.

Regional values use the nearest sample at roughly 5 km scale. Elevation dates from 2011–2015 and population density from 2020. They do not describe exact conditions at the crossing.

Sources and methods ↗

Explore the crossing neighborhood.

Compare land cover within 250 metres of this crossing with the area up to one kilometre away.

2021 · 10 m source

This earlier ESA WorldCover map may differ from conditions today.

Nearby records

These records are within 5 km of the reported location. Distances are straight-line estimates.