The daily train total combines reported daytime, nighttime and switching movements. These reported movements are not arrival times. How reported train totals work. A school bus that crosses and returns counts as two passes on a normal school day.
The reviewed documents contain 1 reference to this crossing. A reference does not confirm that construction was completed. Check the project stage and funding status in each source. See three examples of reading project documents.
Stimson Avenue
listed CON phase
Program
California Section 130 Railway-Highway Crossings Program
Year as reported
2016-2017
Amount, USD
Not listed
What the amount covers
not listed in source
7500258 Stimson Avenue Local Agency 2016-2017 CON 5342 0017000245 75LX320 02/28/19 06/30/24 7 Los Angeles City of Industry N/A 003-18.30 / LA-2546 810871U
Regional sample 1.7 km from the reported crossing location. Climate averages cover 1979–2020.
What these figures describe
Population in the map cell comes from a 2025 WorldPop model, grouped into a hexagon containing the reported crossing coordinate. It is not a count of people who use the crossing. Unavailable estimates remain unknown.
Regional values use the nearest sample at roughly 5 km scale. Elevation dates from 2011–2015. They do not describe exact conditions at the crossing.