The daily train total combines reported daytime, nighttime and switching movements. These reported movements are not arrival times. How reported train totals work. A school bus that crosses and returns counts as two passes on a normal school day.
The reviewed documents contain 1 reference to this crossing. A reference does not confirm that construction was completed. Check the project stage and funding status in each source. See three examples of reading project documents.
W. Sacramento Ave
listed PE phase
Program
California Section 130 Railway-Highway Crossings Program
Year as reported
2021-2022
Amount, USD
Not listed
What the amount covers
not listed in source
130L292 W. Sacramento Ave Local Agency 2021-2022 PE 5027 0323000013 50LP292 08/09/22 12/31/24 3 Butte Chico N/A 001C-185.00 / BUT-1121 753404A
Regional sample 4.3 km from the reported crossing location. Climate averages cover 1979–2020.
What these figures describe
Population in the map cell comes from a 2025 WorldPop model, grouped into a hexagon containing the reported crossing coordinate. It is not a count of people who use the crossing. Unavailable estimates remain unknown.
Regional values use the nearest sample at roughly 5 km scale. Elevation dates from 2011–2015. They do not describe exact conditions at the crossing.