The daily train total combines reported daytime, nighttime and switching movements. These reported movements are not arrival times. How reported train totals work. A school bus that crosses and returns counts as two passes on a normal school day.
The reviewed documents contain 1 reference to this crossing. A reference does not confirm that construction was completed. Check the project stage and funding status in each source. See three examples of reading project documents.
San Antonio Ave
listed PE phase
Program
California Section 130 Railway-Highway Crossings Program
Year as reported
2019-2020
Amount, USD
Not listed
What the amount covers
not listed in source
7500286 San Antonio Ave Local Agency 2019-2020 PE 6303 0721000024 50LP286 11/01/20 12/31/24 7 L.A. Pomona N/A 0018-515.20 003-32.80 / LA-1242 746932J
Regional sample 4.8 km from the reported crossing location. Climate averages cover 1979–2020.
What these figures describe
Population in the map cell comes from a 2025 WorldPop model, grouped into a hexagon containing the reported crossing coordinate. It is not a count of people who use the crossing. Unavailable estimates remain unknown.
Regional values use the nearest sample at roughly 5 km scale. Elevation dates from 2011–2015 and population density from 2020. They do not describe exact conditions at the crossing.